Two patch pipelines
Who can ship a patch, when it ships, and what decides whether it reaches you
Vendor OS patch
- 1. Vendor fixes and signsOne accountable publisher with a release process
- 2. Fixed scheduleMonthly, second Tuesday, since October 2003
- 3. Canary assets firstA small subset installs it to surface breakage
- 4. Staged rolloutWaves inside booked maintenance windows
- 5. Verify installationConfirm every asset runs the patched build
Open source dependency patch
- 1. Anyone with the publish tokenThe maintainer, or whoever phished them, runs
npm publish
Trust gap - 2. Live in seconds, any timeA new
x.y.Z+1with no review and no schedule
Fixes and malware share it - 3. Range accepts it
^4.17.21matches on the next fresh resolution - 4. Lockfile changesBot PR,
npm update, ornpm audit fix
Your control point - 5. CI and deploy
npm cireplays exactly what the lockfile says
The vendor pipeline puts review before release and testing before rollout. The dependency pipeline has no checkpoint until step 4, the lockfile diff.
